Showing posts with label Tile Projects. Show all posts
Showing posts with label Tile Projects. Show all posts

Saturday, March 5, 2016

Master Bath Shower

How did your week go?

You know the phrase, "the best laid plans of mice and men often go awry? 

Well, our week went kind of like that, only without the mice.

Mr. DIY took the week off to work on reno-ing the shower and guess what happened?
On Saturday night, he said that he felt like he was coming down with the flu.
And he was right... 
Mr. DIY is rarely ever sick, but he stayed in bed all day on Sunday.

Let's back up a bit. Our lovely brass framed shower had to be replaced before we could put our house up for sale. It was looking pretty bad. Some of the brass had worn off  the frame and some of it was corroded. It just looked awful. We didn't really want to redo it and spend $2,000+ on it, but there was no way around it. Many houses in our area have upgraded to a frameless shower and they are pretty expensive. Ours is going to cost close to $1,500 just for the glass part and not including the tile.

One of the difficult parts of the reno was finding a tile that went well with the existing floor tile that we installed 6+ years ago. We search Lowes and found the accent tile , but we really lucked out when we found a tile at Home Depot that went well. Here are the 3 together.
Pretty good, don't you think?


Here's  how the shower looked before:

Ew.


Mr. DIY was able to demo the shower on Saturday before he fell ill.


On Sunday, I gave Mr. DIY some of the herbal supplements that I've been taking to heal from lyme disease and on Monday, he felt well enough to put up some cement board that the tile would be attached to. That's as far as he got on Monday as he was still sick and his energy didn't hold up.

He was able to start tiling on Tuesday. 

He was making slow, but good progress on the tiling for the next few days and the company who will install a frameless shower came to template on Friday. 
Mr. DIY continued to tile around the back of the tub. He would have grouted today (Saturday), but decided to replace a few of the tiles that didn't look good on the end of the horribly unlevel, unstraight knee wall. The tile adhesive has to set for a day, so he'll have to grout during the week sometime.

The toilet area in the Master Bath is already painted Sherwin Williams Silver Strand lightened to 75%. We'll start painting the rest of the bathroom the same color and I can't wait to see how it looks with the accent tile. 

That's how our week went and Mr. DIY is still on the mend. 

Hope your week went well.

Pam

Sunday, April 25, 2010

Upstairs Bath Progress

I wish I had a true before of the upstairs bath, but I don't. I can only tell you that it had lavender walls and Waverly floral rugs & shower curtain. (Update: my sister Lynne emailed me & sent me a lovely before photo. It is below the next photo.) We painted it back in January a neutral beige because we are going to put our house on the market soon. About a month ago we tiled the floor with the same tile as the Master Bath. It was much easier to do this bath than our Master!


Here is the bathroom painted lavender.

Here's what it looked like after we painted.Uhhh, can you say BORING? This was the first room in the house to be BEIGE. So, I knew I had to do something!
Here's the lovely vinyl floor...before the tile.
Here's the tile floor installed. It looks a lot warmer and feels so good on your feet!
I would love to frame out the mirror in a dark painted color, but it would add another project (moving the light fixture down). I also have to find some interesting accessories for the counter. The artwork on the opposite wall is my next project.  The frame is going to get a fresh coat of dark paint!

I replaced the gold framed artwork with these faux stone reliefs which were in my hallway. I never really liked them there, so I painted them green & then a brown over it.
Love the cost .... $0
I also painted the little drawers that hold cotton balls & Q-tips. Here's the before:
I think it still needs something. Maybe a different color on the edge and on the little balls on the drawer fronts.
I still have a little work to do in this bath, but it has definitely come a long way!
Hope everyone had a terrific weekend!

Thanks for stopping by,

Pam

Linking up with 
Remodelaholic for Remodelaholics Anonymous Meeting
Romantic Home for Show and Tell Friday
Bobbypins Boardwalk for Boardwalk Bragfest
Finesse Your Nest for Shop the House Sunday
Between Naps on the Porch for Metamorphosis Monday
DIY Showoff for DIY Project Parade 
It's So Very Cheri for Spotlight Yourself
Domestically Speaking for the Power of Paint Party 
Blue Cricket Design for Show and Tell
Room To Inspire for Be Inspired
Shabby Chic Cottage for Transformation Thursday
My Backyard Eden for Make It Yours Day 

giveaways

HookingupwithHoH

Saturday, April 10, 2010

Tiled Laundry Room Floor

As many of you know, I was in California with my girls last week visiting friends and family. We spent every day shopping...more posts to come on the places we went. Here's the previous post on my laundry room when I added the accessories.
While my girls and I were having fun in Southern California, Mr. Fanatic was working & in the evening he came home and installed a new tile floor in our laundry room! What a guy! This is what it looks like now:


This is what the vinyl floor looked like before.

And this is what it looks like now:




So purdy! And easy to clean! Yay!!! The cost for this project was aproximately $125, which included Tile (on sale at Lowe's for 97 cents a sq. ft), backerboard, screws & new base & shoe molding.

This was so nice to come home to! How great is that? ... Maybe I should go away more often! LOL! (Only kidding honey!)
Thanks for stopping by,
Pam


             

Saturday, March 20, 2010

Steps to Tiling the Master Bathroom Floor

So you probably have seen the  Master Bath Reveal and know that our bathroom now looks like this and we are enjoying it.



But before our little (ha!) project, our bathroom flooring was vinyl & since it had to be replaced, Mr. Fanatic took a week off from work. By the end of the week he was definitely ready to go back to work! Here's what the vinyl floor looked like.


It was a long week plus a few days, but we finally made it! Our Master Bath & closet is approximately 175 sq ft. so it was a big job. If you haven't installed tile before, I highly recommend a good book on the subject.

Here's what we did:
Saturday:Removed toilet, vanity, doors, closet doors.
              Tore out existing vinyl flooring and sub floor
              Removed baseboards



Sunday:  laid down cement board

 Monday: Attached cement board with 800 screws & taped joints




Tuesday & Wednesday: Installed tile ... making sure that the lines were squared with a chalk line, spread thinset with a notched trowel, then put the tile down. Tile must be pressed down evenly so that the edges are even. The orange spacers keep the spacing even as you are setting the tile. Mr. Fanatic has a tile saw which we've used on other projects. Lowe's will cut tiles for no charge, but if you have angles in your bathroom, it would be better to do the cutting yourself. The tile from Lowes was a closeout at 68 cents a square foot.
The whole project including backerboard, screws, tile, new furniture base molding,& toe kick for the vanity was $407. Not bad!
  
Thursday: Grouted tile. This is probably the easiest thing to do of the whole project. Grout is spread on all the tile & then wiped off. The grout has to be wiped several times to get all of the grout off the tile.






Friday:The vanity was installed-(we wanted the vanity a little higher, so  he installed it on wood 1" higher)


 He also installed tile on the front of the tub. It was attached with mastic. He also started on installing the baseboard.



Saturday: Finished baseboard, filled & sanded nail holes. Touched up baseboard
I painted the molding first, then filled holes after it was installed & touched up the paint
We covered the vanity side where it you could see the shims with a veneer skin that I ordered for another project but didn't use
The veneer toe kick for the cabinet was only 4" high, so we raised it up 1/4" off the floor, leaving a 1/4" gap at the bottom which will be covered by a piece of shoe molding -The toe kick is now 5 1/2" high so the 1" gap at the top that the toe kick doesn't cover will be covered by a 1 1/4" piece of scribe molding.





After putting the vanity back together,the vanity top was put on.
Then the toilet was hooked back up (yay!!!)



We are certainly enjoying our new master bath floor, but it was definitely hard work. I guess we are gluttons for punishment (as my mother used to say) because we are going to be replacing the tile in our upstairs bath starting next weekend! At least the bathroom is much smaller!!!
This weekend we are working on our honey do list and doing a little Spring yard clean up.
Anyone doing any weekend projects? I want to hear about them!

Thanks for stopping by,

Pam